Estates

Information Index

A list of presentations, films, policies,strategies and posters which are available for staff and contractors for information purposes.

 

 

 

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

A

Asbestos Management Plan

AMP Version 13 - Current (Docx 153k) Critical Summary - Current (Doc 140k)

AMP Version 12 - superseded (Docx 157k)

AMP version 10 - superseded (docx 155kb)

Asbestos Register

Frenchay Asbestos Data May 2013 - Current

Glenside Asbestos Data May 2013 - Current

St Matts Asbestos Data November 2011 - Current

Bower Ashton Asbestos Data May 2012 - Current

 

Asbestos Movie

How to safely remove an asbestos window and frame.

B

C

Cabling Works

How calls are to be raised for any data/voice work. 28k 2007 word doc

Contractors Conference

Presentation from the contractors conference - Sept 08 (Large file.. 2+ Mb)

Consultants - Estates Approved List

Consultants - Estates Approved List

Expired - Approved list of Architects, Building Surveyors, M&E Engineers, Project Managers, QS/Cost Managers and Structural Engineers used by the department.

Contractors - Estates Approved List

UWE/030/2007E List of Building Contractors on the Estates Framework Agreement September 2008 (updated Jan 2010)

D

Design Guide for Buildings PDF 32Mb

Drawing Production and CAD Standards PDF 30Mb

Design Guide - Appendix 1: Energy Management Documents PDF 30Mb

ST-014-DS10 Design Guides - Steel PDF 1.5Mb

ST-014-DS10 Design Guides - Plastic PDF 2Mb

Design Guide - UWE Door Specifications PDF 745k

 

E

University Energy Policy (PDF 220k)

University Energy Strategy (PDF 135k)

F

Estates Forum (Powerpoint Presentation) Novermber 2012 PPTX 25.65Mb

G

Green Gown Certificates and Reports (zip file 6Mb)

 

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

H

Health and Safety File Procedure

UWE H&S File Procedure

Health and Safety File

 

I

 

J

 

K

 

L

Lifts Out of Order Poster

If a lift is discovered out of order, please used this poster and report it via the work request system.

M

Management Of Contractors

Management of Contractors Policy

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

N

No unauthorised access poster

Version Jan 2009

Novation and Collateral Warranty Template (docx 143k)

O

 

P

Q

 

R

S

Safety Requirements

UWE SAFETY PACK ver2 PDF 2.85Mb

Safety principles for major projects Rev 1 PDF 188k

 

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

T

The Uk Government Timber Procurment Policy

The policy is mandatory for all central government departments, executive agencies and non departmental bodies. Universities, colleges and other publicly funded autonomous organisations are encouraged to adopt sustainable timber procurement policies.

U

 

V

 

W

X

 

Y

 

Z

 

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z